RE: Prem9 Dec 2022 11:16
I only joined the group v recently so no idea who anyone is. Seems a good positive group. This is a last list from a few days ago.
Questions for StockBox
Updated 05.12.22
1. Where is the Resource Upgrade Statement (RUS) and what is causing the delay?
2. Is the pilot plant on target to start producing by the end of Q1 2023 and where are we at currently?
3. Is the pilot plant likely to produce more than the what what was originally estimated for Suzhou and if so is PREM allowed to sell at spot auction price?
4. How many assays are completed and test results outstanding specifically: a) for the pilot plant, b) to complete the DFS, and c) for the wider epo area
5. Are there any plans to explore the gold, copper and other minerals within the EPO licence in 2023 and are you looking for JV opportunities?
6. What is the exploration target for Zulu including the EPO licence area?
7. What’s next for Zulu after the pilot plant goes live? Are there plans to:
• Expand or add more open pit mines;
• Build a 2nd pilot plant;
• Process the Petalite and Tantalum stockpiles;
• Sell the Lepidolite and Rubidium;
• Build a full size mine and processing plant;
• Finish the DFS.
8. What further work, besides drilling, testing and issue of assays, are needed to complete the DFS? In terms of %, where are.we at with the DFS?
9. Its been communicated in the past (during a Stockbox interview) that the mining minister or the Zimbabwe President would give PREM a mining licence for Zulu (including EPO area) on the day that the pilot plant is hot commisioned. Is this still the case and how are we progressing on the environmental, water, road and export permits?
10. What is the expected running costs for the pilot plant in full operation and do you anticipate this coming down when the running of the plant is full optimised?
11. Can you give an update on RHA Tungsten, Circum Minerals Potash, Otjozondu Manganese and the JV with Li3 for the lithium/gold assets at the Mutare Greenstone Belt?