RE: Proof of Concept24 Jan 2021 16:51
Maersk completed less than 1700 hours of the 2000 required for an Interim LONO on a Wartsila engine, let alone a full LONO.
As MSAR was produced at a refinery previously. I would expect that if there is one vessel it will use MSAR on a MAN engine, as there are more MAN engines in the fleet. If a second vessel is used I would expect it would have a Wartsila engine again using MSAR.
BioMSAR is yet to be produced in volume so it would be reasonable to think that when the LONOs are completed for MSAR the new fuel could be available for further LONOs as required.