RE: Geotest post13 Sep 2025 07:35
We could see early indications/visual results as early as the back end of next week. 200m is not that deep. AI:- "Drilling 200 meters with a diamond core drill rig can take anywhere from 2 to 10 days, as it depends heavily on the drilling speed, with typical rates ranging from 20-30 meters per hour to about 100 meters per day. Factors like ground conditions, bit wear, water supply, and the specific equipment used also influence the overall time, with some specialized rigs capable of drilling at a faster rate". One things for sure with the 30 holes they have planned there should be constant news flow.