RE: MTS progress16 Jul 2019 22:14
Old rascal tbm
Evening guy s . After a long walk round May beck . Next door to wood Smith . I called in at the drop in . Was made very welcome by the SM staff .
I was told the plan is 3 tbm s and they get buried at the end of use. Just like the Channel tunnel ones did . For local people it was more to get across that there will be a structure seen from surrounding area. For temporary winding gear.
And that the Galloway deck in operation will use Explosives to break it way down and across..
Hope that helps.