RE: KAT - Multibagger Opportunity18 Apr 2024 19:14
BLYVOOR GOLD TAILINGS PROJECT - Highlights
· Total project resource size of 1,410,000 oz gold consisting 500,000 oz gold in the measured category (35.5%), 368,000 oz gold in the indicated category (26.1%), and 542,000 oz gold in the inferred category
· TSF 6 and 7 was upgraded to Probable Reserve status containing 424,000 oz gold and 392,000 oz gold, respectively
· The mine plan includes 1,325,822 oz gold after applying a 2% dilution factor, a 95% Mine Call Factor, and accounting for 1% ore losses.
· The CPR demonstrates (before incorporation of the results of the recent metallurgical optimization work):
An unlevered Project Net Present Value ('NPV@7.9%') of US$ 114 million, a 33% Internal Rate of Return ('IRR') and a Return on Investment ('ROI') of 64%;