RE: CNPC25 Jan 2024 14:00
Yes it all seems to part of a plan Bobby with the Chinese already in country but seemingly in the wrong place judging by this article from CNPC: https://news.cnpc.com.cn/system/2023/04/25/030099945.shtml
Translation: Signing a 100-million-yuan engineering service contract to open a new market for Western Drilling in Georgia
China Petroleum News Center
Publication date: 2023-04-25 10:47
News from China Petroleum Network (Special Correspondent Niu Yun, Correspondent Wu Rongrong) On April 17, after more than a year of follow-up research and promotion, Western Drilling officially signed a RMB 100 million contract for drilling, logging, and cementing engineering services in Georgia. This is the first time that Western Drilling has entered the Georgian market in West Asia.
Georgia has a stable social environment, broad prospects for the oil and gas market, and promising economic benefits from the project. This project is located in Block V in the Kutaisi area. Western Drilling is responsible for drilling, logging, directional, cementing, coring, simple pressure control, mid-course testing and other services. The first well E-CH-FN1 is designed as a three-split directional well. , the design well depth is 4580 meters.
In April 2022, Western Drilling received a bidding invitation letter from Georgia's Western Gulf Petroleum Engineering Co., Ltd. and was invited to participate in the bidding for engineering and technical services in Block V in the Kutaisi region. Western Drilling attaches great importance to this, and has traveled to and from Beijing many times, organized specialists to conduct on-site inspections of oil fields in Georgia, and repeatedly communicated and negotiated with the senior management of Western Gulf Company to promote business progress and cooperation at multiple levels. For more than a year, multiple parties have repeatedly discussed and communicated, and finally achieved the expected goals and successfully signed the contract, creating new profit growth points for the high-quality development of PetroChina's overseas business.
There is little well geology and actual drilling data in Block V in the Kutaisi area, and the project is adjacent to a nature reserve. There are residential areas, high-voltage lines, railways, etc. around the well site, making it an environmentally sensitive area. The designed trajectory of the first well is a bypass well. The upper strata are loose and trajectory control is difficult. In view of the construction difficulties, the specialized units of Western Drilling cooperated efficiently, participated in technical management with a highly responsible attitude, implemented the concept of green and environmentally friendly drilling, and studied countermeasures for various difficulties and risks in advance. On the premise of ensuring safety, we continued to provide high-quality services. Shape the brand image of Western Drilling.