RE: whi report14 Aug 2018 10:55
Bridget, my interpretation would be, as been suggested by some, drill future wells deeper for EldariB, but with a well completion that would allow future perforation of 9/14/15 after a point in the decline curve, either then produced together, or just from Eldari A.
Would lengthen the useful lifetime of each well, with only a relatively modest capex intervention.
Definitely suggests, a CPR re-evaluation is needed - if not already underway