RE: Design freeze3 Jun 2020 05:17
I see what you are saying regarding the whole package merchant and that would make sense seeing as four companies need to be making exactly the same kit, cassette, prick, etc.
The hard part technically was always achieving the high performance bar for the test strip. The tweeting from Abingdon, job ads, preparation for production and Colin on Sky News suggests to me that most difficult most important aspect has been achieved.
However, they can’t formally “freeze” the design of the package to be manufactured by the four different companies until the results of the REACT study come back and they decide what cassette etc they are going with.
That would make sense.
So from that it looks like we are there technically so there’s excitement, confidence and preparation but they can’t formally announce anything because the whole package to be manufactured is not yet decided upon.
If that’s where we’re at then that would explain all the confusing mixed messages we are getting to suggest that the thing is finished but “design freeze not yet achieved”.
Ok. That’s my current opinion. It’s been confusing but looks like we’re there bar the shouting and just waiting for REACT study results and decision on final package including connectivity app which is probably being tested and assessed in parallel.
Happy days.