RE: Canada today5 Jun 2021 06:44
In order to ensure the drilling is completed within a six-month time frame, operations related to the program will be conducted on 12-hour shifts, running from 07.00 to 19.00 hours, seven days per week (Monday to Sunday). Care will be taken to monitor noise levels and keep disturbance to minimum. In exceptional circumstances, some site activity may be required to be conducted outside these hours, but in this event, any additional disturbance will be kept to a minimum. Drilling activities may be scheduled during Public Holidays if required.