RE: SP/TURNOVER4 Apr 2021 14:16
Re the Kimmeridge, this from the HH update RNS of 15/01:
Following the successful flow testing of the Kimmeridge oil pool, during which 52,780 bbl of 40deg API oil were produced, further development of the Kimmeridge oil pool also remains a significant objective for the Company. Consequently, plans have now been made for an infill well to determine the lateral extent of the Kimmeridge oil pool, proven by HH-1 to lie within a natural fracture system of significant vertical extent.
The Kimmeridge HH-4 well, also situated updip of both HH-1 and HH-2z, is likely to be a highly inclined or "slant" well, designed with a lateral orientation approximately orthogonal to the known regional open natural fracture direction, so as to maximise the number of open fractures penetrated.
It is expected that the further HH-3 Portland and HH-4 Kimmeridge infill wells will be planned in detail and drilled at Horse Hill following the completion of the Company's potentially transformational initial Turkey Basur-Resan appraisal drilling campaign.