RE: Loxley12 Jun 2022 14:50
... the 43-70 billion cubic feet of independently estimated recoverable gas at Loxley ...
... the estimated annual Loxley gas volumes, derived from data in four prior boreholes, well tests and other
technical data are estimated, in energy equivalent terms, to be equivalent to the annual gas
consumption of 110,000 households or the annual electrical power consumption of 200,000 homes.
With gas prices currently at around £15/1000 ft³, the project could thus be of significant material
benefit to both the exchequer and the Surrey economy over its expected 20-year life.
UKOG’s proposed development of the already discovered Loxley resource requires only one well and
a sidetrack to confirm that it can produce commercially viable volumes and rates before longer-term
production consent is requested. The period where a drilling rig is required on site to make this
production decision is therefore short, being c. 45 days for the first vertical pilot hole and a further 30
days for the sidetrack, then followed by a period of flow testing of up to 6 months’ duration ...
https://www.ukogplc.com/ul/UKOG%20Jeremy%20Hunt%20MP%20100622.pdf