Tandayama16 Feb 2024 12:07
I'm surprised the PFS Addendum / PFS3 STILL doesn't make any allowance for Tandayama?
Why? We have MREs for Tandayama. According to today's RNS:
"The TAM deposit outcrops at the surface, resulting in a low strip ratio, offering an excellent opportunity to provide additional mill feed for up to 7 years and the potential for an earlier start of metal production from an open-cut mining method.
The current evaluation of the TAM deposit is not at a PFS level and is, therefore, not included in the Cascabel Project economics presented above or in the PFS mine plan."
Surely near-surface, early start production is precisely what we need for a lower Capex start-up?