RE: RNS27 Nov 2019 07:38
Following displacement of drilling fluids to clean completion brine, well completion operations included: the installation of 4.5" diameter slotted steel liner, production tubing, a high-capacity/high-rate downhole electric submersible pump ("ESP") and a new wellhead. Immediately following rig departure, HH-2z flow lines and ESP control cables will be connected, and the site's oil stock-tank storage capacity will also be significantly increased.