RE: cey15 Feb 2019 09:27
ABC Project ("ABC")
· Maiden resource estimate declared at Kona South prospect, at a 0.5 g/t gold cut-off:
o 19.6 million ore tonnes at 1.03 g/t gold in the Indicated category for 650koz of gold;
o 16.1 million ore tonnes at 0.87 g/t gold in the Inferred category for approximately 450koz of gold;
o The mineral resource area is defined from surface, along a 2.3 km strike, and remains open in all directions; and
o Detailed 3D grade modelling indicates there are high-grade plunging shoots within the 50m x 50m broad-spaced drilling.
· Excellent conversion from discovery to defined mineral resource:
o Active exploration started Q2 2017, first gold mineralisation discovered Q3 2017, delineating the Lolosso Gold Corridor ("LGC"), a gold anomaly with a 23km strike length;
o 25,000 metres drilled to date across the ABC landholding, of which 65% was focussed on the Kona South prospect;
o Average discovery cost of US$8.50 per Indicated ounce; and
o Encouraging drill intercepts returned at the Kona Central prospect; Resource upside potential with further assessment, infill drilling and 3D modelling planned during 2019.
· Preliminary metallurgical test work suggests no major metallurgical issues with high recovery rates expected from conventional CIL processing.
· A 34,000 metres drill programme is budgeted for 2019 focussing on resource development at Kona Central and Kona South, while testing the resource extension potential between the two prospects, drill testing high priority targets along the LGC in addition to airborne magnetic/radiometric surveying and geochemical sampling.
Mineral Resources
The mineral resource data presented in the tables included in this announcement, comprise a summary extract of the of the Doropo and ABC mineral resource report, using drill assay results received up to and including 10 December 2018. For comparative purposes, data for 2017 has been included for Doropo. In the instance of ABC, this is a maiden mineral resource and therefore no previous data has been provided for comparative purposes. Numbers have been rounded and therefore they may be small differences in the totals.
2018
2017
Category
Tonnage (Mt)
Grade (g/t)
Gold Content (Moz)
Tonnage (Mt)
Grade (g/t)
Gold Content (Moz)
Doropo Project
Measured
(0.5g/t cut-off)
Indicated
50
1.31
2.13
32.6
1.3
1.35
M+I
50
1.31
2.13
32.6
1.3
1.35
Inferred
19
1.3
0.8
24.8
1.2
0.90
ABC Prospect
Measured
(0.5g/t cut-off)
Indicated
20
1.03
0.65