Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.
Lovely RNS
“ · Up to four historic manganese occurrences were successfully located and sampled in the field within an 8km-belt
· 40 grab samples were obtained which assayed from traces up to high-grade results of 67.18% MnO occurring at the Moshaneng borrow pit and 68.01% MnO at the Mheelo prospect
· The latter prospect is located just 6km from the Giyani Metals K-Hill manganese project where a feasibility study is due for completion in Q3 2021 (April 2021 PEA indicates an 80% IRR)
”
https://twitter.com/ZaksTradersCafe/status/1400086848525979661?s=20