Countdown to the LE6 Sep 2018 12:12
We now have the Production Concession, so will the GSA follow shortly? With hindsight, could we really have signed the GSA without the Production Concession, probably not. I don't remember any of the experts mentioning this while we were all moaning about the GSA delay. I think that the major milestones, that are in the public domain, leading up to the LE are:<br />GSA<br />CPR for Seismic Phase 2<br />Drill & Test TE9<br />CPR for Seismic Phase 3<br />Drill & Test TE10<br />CPR for TE9<br />Production Concession Design & Funding<br />Drill & Test TE11<br />CPR for TE10<br />CPR for TE11<br /><br />This takes us up to March 2019 unless events slip.<br /><br />Events at Sidi Mokta would appear to be a side show, to keep the news flowing, and not materially affecting the LE (even with the possible 9 tcf's) and the new Paleo find may get switched into TE 11 or be left for the new owners.<br />