RE: “Tin assays are outstanding from the laboratory pending further check sample and ore grade analysis”20 Oct 2025 07:32
Looks good:
3 further drill holes have been completed since the last drill programme update (RNS: 11 September 2025), with a 4th well advanced, and another commencing today.
All 3 drill holes intersected the logged full thickness of the Redmoor sheeted vein system, with veining and visible mineralisation consistent with the high-grade Redmoor deposit, with some drill holes extending beyond their planned depth following the intersection of additional mineralisation.
New drilling underway