RE: Production planned for next year if all is as expected.21 Oct 2024 10:38
Original TD 8000 ft. Extended now to 8850 ft due to extended gas layer with high Hydrogen concentrations coming to surface.
The detection of a helium gas-show over these intervals confirms the presence of helium within the previously identified gas system. The Company is drilling on to the primary target in the Flathead formation at approximately 7,410ft (2,260m) and planned total depth at approximately 8,000ft (2,440m). Drilling is progressing well and remains on schedule.