Southwark ConcoPhilips13 Jan 2023 12:11
Discovered in year 2000 by ConocoPhillips 94.2 bcf
The pipelines from Blythe and Southwark platforms are tied into the reused Thames to Bacton 24-inch pipeline (PL370), renamed the Saturn Banks Pipeline System.[4]
In addition to the offshore development the Saturn Banks reception facilities at Bacton gas terminal were installed.[6]
Later phases of the Saturn Banks Project will include the Nailsworth, Elland and Goddard gas fields. Nailsworth is projected to be produced through the Southwark platform.[6]