RE: Week ahead3 Feb 2020 11:50
Wellhead flowing pressures have remained high, indicating the well's long-term flow potential. Although significant, the water cut has been stable since testing began. Analogous wells close to West Rustavi have produced for long periods: For example a vertical well located two kilometres to the north has produced for 20 years with a similar water cut. The Company expects WR-38Z, a horizontal well which has already produced more than 5500 barrels of oil, to be significantly more productive than a vertical well.
Once the facilities have been installed, the Company intends to flow the well at an oil production rate of approximately 150 bopd and a gas production rate of more than 1 MMCF/d (giving a combined total oil and gas rate of 322 boepd).
That seems to address the water cut amd your break even point.