RE: Results15 Nov 2023 09:33
It was nice to be reminded of this in the Audit RNS…
“In May 2023 the Company completed an independent verification of the prospective resources of the Tai Prospect (Tai). The evaluation of the total gas and helium prospective resources, and completion of a Competent Person's Report ("CPR") for Tai has been carried out and issued by reserves auditors ERC Equipoise Ltd (ERCE).
The unrisked best estimate of helium estimated to be potentially recoverable from undiscovered accumulations ("2U") in the report is 2.8 billion cubic feet (Bcf) and the 2U is 212.2 Bcf across the combined intervals of the Lake Bed Fm, Nsungwe Fm, Karoo Sandstone and Weathered Basement. This demonstrates a 61% increase in the original resource estimate from the previous 2020 CPR completed by SRK Consulting (Australasia) Pty Ltd ("SRK").
The unrisked high case estimate of helium estimated to be potentially recoverable from undiscovered accumulations ("3U") is 7.1 Bcf in the ERCE report, which is a 30% increase from the previous 2020 CPR completed by SRK. The deterministic sum of the 3U prospective resource is 437.8 Bcf in the ERCE report, which is a 294% increase from the previous CPR referenced above.
These substantial increases are the result of more detailed interpretation of the additional 2D seismic data acquired across Tai in 2021 (from Phase II and Phase II seismic surveys), and the Company's improved understanding of the structural closure.”