RE: Proactive Interview5 Sep 2024 10:01
Highlights:
- Looking for ways to use water that He is dissolved in rather than injecting it back into ground.
- LB talks of production 'as and when'
- Internal modelling indicates positive economics (based on CAPEX, OPEX and variables like flow rate, gas:water ratio etc.)
- No hydrocarbons, carbon dioxide etc. = cheaper and better environmentally
- 20-30 development wells needed as shown from EWT/modelling. Development wells are cheaper to drill than exploratory wells + HE1 have rig, making it cheaper/quicker.
- Artificial lift is used in ~50% of O&G projects.
- Electronic submersible pump can be used as needed based on the project.
FINANCING!
- Further financing will be needed (everyone knew this), but will look to be a project which means HE1 can talk to banks for debt financing.
- Once Mining Licence and development license are given (normally 3 months), then they can advance as a project.
GALACTICUS PEGASUS
- is about diversifying portfolio geographically and geologically
- Earlier revenues
- Is 1 step ahead of Tz. 1st development well drilled. Should be going in Q3/Q4 of 2024