RNS 20th September24 Sep 2010 15:31
Preparations for testing of the Te Giac Den appraisal well, TGD-2X, on Block 16-1 in the Cuu Long Basin offshore Vietnam, have been extended for approximately two weeks. Pressure control packers and seals downhole have been impacted by the high temperatures in the well requiring changes to the original programme and modifications to equipment to ensure a safe operation.