RE: GIT7 Jun 2019 20:59
Jaf, most of us have moved on now. A lot of the past trolling was about how Mr Masterman was untrustworthy, going to take the company private, using it as a funded lifestyle. All water under the bridge now, whichever side of that argument you were on.
Now we have dozens of tonnes of steel at the mine. Top notch, brand new crusher, Jig and mill, and to be completed this month, concentrator. Nothing to do with personality. Everything to do with how long it takes to fill those three sixty tonne trucks with ore and how long it takes to drive them 100m, then up the ramp to the crusher. Up, down, up, down, up down. Every truck $780 revenue at yesterday’s APT price of $280/mtu.
Can something go wrong with the kit? Probably. Will it stop the mine for long? Probably not.
Wait for more certainty, by all means. If you wait long enough, I can sell you the load I bought at 0.28p.
ATB