RE: Sweepstake13 Feb 2019 14:58
"At an operating level of 40,000 tonnes a month, BlueRock expects its mining operations to be profitable at a grade of 2.5 cpht. The Company's average grade from all of its mining operations to date is 2.6 cpht and excluding the mining of the very low grade material in the higher levels of the pit BlueRock estimates that the average grade to date is approximately 3.5cpht."
However as you state there was a £750,000 business loss on the 6 month period which I have taken as £1.5M for the year
After this at breakeven point to give us a profitable company the ctht on an annual 300,000tonnes would be 3.4ctht
At 4 ctht the profit would be $600,000. For 400.000 it would be $1,332,000
At 5ctht it would be $1.6M. . For 400.000 it would be $2,640,000