RE: Drilling beyond 550m23 Jul 2025 10:51
Lenigas twists things to suit himself, evident from GGP driling RNS 25 June 2018 that beyond 550m vertical was drilled at Haverion:
First drilling campaign at Havieron comprised four vertical core holes for a total of approximately 2,400 metres, results for three remaining holes (HAD002, HAD003 and HAD004) are pending and are expected to be available within the coming weeks.
So Lenigas BS there imo.