RE: On twitter16 Oct 2018 13:31
I know I'm out of step with many with Rosy Coloured spectacles on here, but I must point out that apart from being pleased our team has made it onto the CPO-5 drilling sites I'm less than ecstatic about the progress.
Taking them one at a time - where's the on the Indico -1 site? Am I missing something, shouldn't there be a rig partially in position and built on site, am I missing some of the phots? It looks nowhere near ready to spud anything, unless they mean pick a few spuds out of a nearby veggi patch. Looks like an early November spud to me, please show/tell me I'm wrong!
Mariposa-1 looks fine, though no sign of any workover preparations - so that's not happening any time soon.
Sol-1, basically a cleared site, no chance of that drilling any time soon, the read across is that there is only one rig and the wells will be drilled sequentially, hence having hoped I was wrong, there will only be 1 well completed this year, at best. Our FD's alleged assertion that 3 wells where programmed for this year looks like absolute BS.
So not pleased as we don't know why they are there, lets hope it was to press ONGC or buy them out.