RE: DQE Obligations in 3rd Quarter 202415 Jun 2024 09:40
Don't think the oil will run out just yet,
The Company had assigned a pre-drill resource estimated for the Heron structure of 165 million barrels of in place oil, with 25 million barrels (P50) recoverable resource, based on a recovery factor of 15%. The Heron-1 flowrate is very encouraging and could indicate that the assumed recovery factor is too conservative, however more wells will be required to prove up the total volumes in the structure.Block XX Update.Competent Persons' Report increases total mean unrisked in-place oil resource potential of the Heron structure by 20% to 194 million barrels. Reservoir stimulation studies indicate significant improvements in recovery factor are possible. Heron development base case increased to 33 million barrels recoverable.