RE: Pipeline is fully operational and Ankara has received some signals from Baghdad.17 Aug 2025 09:55
Try 20 bagger in 5 years . Low 48p to over £10 .
if you had the balls to pile in then fair play.
But anything is possible.
GKP at best is a 3 bag from here.
And that's lots off them ducks lining up.
1. Pipeline opening?
2. Arrears payed in full.
3. Production at 80kbopd
4. Proven reserves exceeding 1b barrels P2.
5. And the most important, politics sorted
And that is years away,