One day a man was fixing a car, an he accidentally got brake oil in his mouth. He was about to spit it out, but then he thought, “hmm, this tastes pretty good!” So he would keep drinking brake oil. But his friends were getting worried about him, and they were like “dude, this can’t be healthy.” But he said “Don’t worry. I can STOP anytime.”
As I was going to St. Ives,
I met a man with seven wives,
Each wife had seven sacks,
Each sack had seven cats,
Each cat had seven kits:
Kits, cats, sacks, and wives,
How many were there going to St. Ives?
RE: The ramping crew must be worn out.29 May 2018 19:43
Phase 1 (210 days) � the carrying out of extended well tests (EWT�s) and a short-term well test of the existing HH-1 well to appraise the technical and commercial viability of the hydrocarbon accumulations discovered. Each of the well tests will involve flowing, pumping (as required) and pressure testing with the purpose of evaluating the characteristics of the oil resource that was discovered during the original exploration of HH-1;
Phase 2 (100 days) � this is dependent on the outcome of Phase 1 and may in practice follow Phase 3 below; it involves the drilling of a deviated sidetrack from the existing HH-1 borehole. This will be followed by the carrying out of an EWT;
Phase 3 (110 days) � this is also dependent on the outcome of Phase 1 and involves the drilling of a new appraisal well Horse Hill-2 (HH-2) from the existing well pad. This will again be followed by an EWT.
Phase 4 (45 days) - restoration of the well site to agriculture and woodland, unless a new planning application is submitted.
If the appraisal programme demonstrates commercial viability, HHDL intends to submit a further planning application for a production phase in due course.