The Balcombe-2z well produces from a single Micrite Layer, just one of the Kimmeridge Micrite Layers. During the initial flow period, the well slugged at up to 3,000 barrels per day which had to be reduced as it exceeded separator operating capacity. Duration of the test runs were limited.
This will be flying Friday,,,
Would fancy been out this weekend!!!!
I’m gambling this will flow at a decent rate hopefully 1000 bopd,,, then roll on brockham,, hopefully the same ,,,
This a right gamble come on ANGUS!!!