I am convinced that whoever wrote this got it wrong30 Sep 2019 19:15
"Forward Drilling Plans:
The HH-2 pilot, designed to acquire key geological data to ensure the horizontal is correctly positioned within the Portland reservoir, will drill ahead in 12¼" diameter hole down to around 2,000 ft below surface and will then be cased back to surface. Drilling of 8½" diameter hole and conventional coring over the full vertical extent of the Portland oil pool will then follow.
Upon reaching a total depth of approximately 3,000 ft, HH-2 will be electric logged and then plugged back in preparation for the immediate start of HH-2z. The planned HH-2z trajectory, of total length of approximately 5,800 ft from surface, will contain a horizontal section of approximately 3,200 ft wholly within the Portland reservoir's most oil-productive zone."
Pretty sure "Portland oil pool" should read "Kimmeridge oil pool"
TD doesn't even reach Kimmeridgian Micrite 2 level.
Portland Sandstone 2042
Lower Portland Sandstone 2324
Kimmeridge Clay 2480
Kimmeridgian Micrite 1 2793
Kimmeridgian Micrite 2 3083
Top Corallian 4459