We would love to hear your thoughts about our site and services, please take our survey here.
contracts already renewed for 3 years.....
https://www.wartsila.com/media/news/30-08-2022-renewal-of-wartsila-operation-and-maintenance-contract-vital-to-security-of-timor-leste-s-power-supply-3148029
also came across
New contracts also due at the power stations, a renewal announcement , might,
give further details of the conversions to gas and a time scale.........
The technology group Wärtsilä will ensure maximised lifetime and guaranteed performance of the
Hera (North) and Betano (South) power plants, located in Timor-Leste, in Southeast Asia.
The five-year operation and maintenance agreement with the government of the Democratic Republic
of Timor-Leste was signed in the second quarter of 2017.
The Hera power plant is situated in northern Timor-Leste, near the country’s capital Dili, and
it has an output of 119 MW.
The Betano power plant, situated in the southern part of country, has an output of 136 MW
This operation, maintenance and training contract with Wärtsilä will help us to ensure stable
electricity supply in Timor-Leste,” says Virgilio Guterres, the Director General of
Electricidade De Timor Leste (EDTL), the operator of the power plants.
As the technology provider of the Hera and Betano power plants, Wärtsilä was the best candidate
to support our vision of future’s power plant operation by local Timorese.”
Thanks guys, soz to waste your time......lol
;))
as always the colour scheme and labels , zip to do with the
markets just guessing 3rd party sites.......like this one...lol
;))
Just got this link on a search, its for facebook, Hera Metinaro is the location
of the Northern Gas/lng Import terminal for domestic supply.
Can one of you guys take a look, see if anything of interest in it...thanks
Eto Lda Moving Energy. Hera - Timor Leste
https://m.facebook.com/profile.php?id=459161651082899&_ft_=mf_story_key.641118976327263%3Aog_action_id.641118992993928%3Atop_level_post_id.641118976327263%3Atl_objid.641118976327263%3Acontent_owner_id_new.100012874993661%3Athrowback_story_fbid.641118976327263%3Apage_id.459161651082899%3Astory_location.22%3Astory_attachment_style.og_composer_simple%3Atagged_locations.459161651082899%3Apage_insights.%7B%22459161651082899%22%3A%7B%22page_id%22%3A459161651082899%2C%22actor_id%22%3A100012874993661%2C%22dm%22%3A%7B%22isShare%22%3A0%2C%22originalPostOwnerID%22%3A0%7D%2C%22psn%22%3A%22EntStatusCreationStory%22%2C%22role%22%3A4%2C%22sl%22%3A22%7D%7D&__tn__=C-R
For my sins I hold both, fingers crossed the mnrg ceo
comments mid December-end for production in Italy
true.......
It is the start time of each of those periods , that you might also see
controlling UT trades, like the previous two weeks when we had
4 - 5 a day, keeping us within a tight price range.
0800 on the end of pre open auction 0755-0800
then the usual suspects 0900 1100 1400 1635
end of Fishy notes.........
Just remember when a share in vogue, 0900 1100 1400
PME's become more likely, and the RNA rns red dots
commonly flash.......
PME available to all market users (no not us fish) to call, primary function is auction
but when started only a couple a day, whole pre-post session now covered, there
was a list of other functions
This one grabbed the attention
To avoid an unwarranted market reaction both positive/negative
:((
It's a common one these days across the market, mnrg and eqt had
a similar arrangement, mnrg funded eqt by allocation of shares
and eqt sold them as soon as they could
Both involved in a project in Italy, which is sked to go online this month
its just another way of funding, without getting the pump and dump
death spiral wonga lenders involved and a big fee on top..........GLA
;))
Full PME 1100-1110 and no UT Trade.....nice
save yourself the flashing red dot heart attacks
PME
0900-0910
1100-1110
1400-1410
1635-1645/close if required after 1630-1635 pre close auction daily.
PME's also available 0700-0710 and 1200-1210, rarely seen outside of
market crashes........
agree Jarv
looks primed and ready to move........GLA
Aim Volume
354,247,589
AQSE Volume
39m
picking back up...........GLA
;))
Posted that a few times and after recent setback, UPL will want a winner
to talk about at the AGM
;))
RNA messages can arrive over the rns news wire , anytime, not just rns o'clock
in the morning..........we have plenty in the pending tray
Dunrobin -
Seismic update by Q4 (now)
Corallian departed (driller) update on a new JV structure/new driller in the mix
North Sea back in vogue - are the 3 amigo minnows also up for a lucrative sale
North Sea bid round, or possibly new JV's with RBD who took what was left of
Corallian, after Shell cherry picked its developed gas field.
Island
Further news on Northern Hera Metinaro GAS/LNG Import terminal and tank farm
the who and how it will be supplied - it's not going to be Beaco in the South, tender
for operations (Oct 2022) listed as 2030, the domestic 3 power stations plan by 2025/26
Mediation continues on the Sunrise PRODUCTION path but both sides have stated many
times , first step the PSC, by end of 2022
Horta/Gusmao have had the begging bowls out for Australia, the USA and threatened
China, they could strike a separate deal, for a funder/operator of Beaco.
That would also make Woodside happy, they would then remain the offshore operator
and have only their share of pipeline and remaining offshore costs, to pony up before
revenues flow.
Most Important our CPR due January, that will give us a ball park figure for a full
75% sale of Chuditch, those talks for both JV or sale, probably pending suitors
reviewing CPR and the offers they make...........GLA
;))
First target break the new share base/MC high of 0.2599p
then it's Blue Skies , where strange things happen....GLA
0.17'ish as posted for months prior to the rise, was the nugget
to break, previous sharebase/MC high...it did and a further
100% followed.
Until the placing killed all momentum, while we wait for further Island news
now would be a good time for RBD/upl/Boil to jointly announce , DUNROBIN
:))))))))))
See if it gives us some blue by the end of the week, that story starting to appear
on other media outlets........story and the word spreading, TL waters could have
value returned
knock , knock , who's their, Major, Major who
who do you want, where all in the corridor..........lol
https://www.naturalgasworld.com/woodside-open-to-building-lng-plant-in-timor-for-sunrise-gas-102394
O'Neill confirmed this today.
"The cost of LNG processing capabilities is that you have a longer pipeline (to Darwin) but you just
have to build a train and not all the associated green field equipment, which would have to be built
in Timor," she said.
"That said, there's been a lot of work over the past several years and things that have been done
in the Gulf of Mexico, for example. Look at modular construction."
Modular LNG facilities are typically quicker and cheaper to build and can be scaled up more
quickly.
She noted Commonwealth LNG, which her company signed an offtake agreement with for portfolio
gas this year, is developing its plant this way.
Certainly read's like , they a serious about the new studies, that's a bit more than an off the cuff
response , to the question posed.......GLA
;))
Those questions presumably posted at this event, RNA this morning......
https://www.investegate.co.uk/woodside-energy-grp.--wds-/rns/investor-briefing-day-2022/202212010700021760I/
Think we can say its a typo.......lol
Meg was all gushing recently, deemed it a great honour, to have a one on one
face to face meeting with Prime Minister Rauk, also said after, she had told
him Woodside , would be honoured and delighted to continue further
EXPLORATION in the Timor Sea
Curious that last bit, all 3200 sq km of the Sunrise developed, re-did the 3D
for the lot in a single day in Dec 2020.....
As far as I know, they have no other holding in the TL maritime area, so what
exploration? , been holding onto something in that 3D ?
Or from left field, Woodside have something else coming to them in TL waters?
wtfkni , it will all come out EVENTUALLY........lol
;))
The old plan , lets be kind and say was poorly put together, based on Sunrise
only, with beaco build one string and take it from there, with up to 4 strings
longer term development........
The upgrade, they had 3 fields (30 tcf) and a HUB and still talking 4 strings
Must be far more economic than the original proposal, likewise Gas prices
much , much higher than back then, adding to margins........GLA
;))