RE: Open communications16 Dec 2021 12:39
Drilling Programme
Kodal has completed an initial RC drilling programme at the Fatou Gold project consisting of 11 drill holes for 1,242m completed. Drillholes were unable to reach planned depth in five (5) of the eleven (11) completed holes due to the presence of artisanal workings and poor ground conditions. Initial geological logging of the drillholes has confirmed the presence of sulphide mineralisation and alteration of host rock geology that may indicate the presence of gold mineralisation. All assay results are pending.
Just wondering is this a problem and needs to be brought up?
Or is it nothing to worry about I know maybe project some time away.