More to come8 Nov 2021 14:51
Based on wireline logging and drilling data, we are configuring the next two uphole primary production test intervals to evaluate liquids rich natural gas prospects, with flowback and full buildup analysis planned for each zone. We are currently preparing to perforate the second test interval in the overthrust sheet of the Herrera Formation, with a 270-foot gross interval (145 feet of net pay) targeting the Gr7bc sands. The third test is designed to evaluate an 84-foot interval (62 feet of net pay) at the top of the Gr7a Herrera sands. The second test is expected to be completed within the next three weeks, and we anticipate the third and final test to be completed by the end of December 2021.
All I want for Christmas is....successful test results. End Nov, end Dec key dates. Hang to hats folks. Any shorts still open?!