RE: PQE RNS21 Oct 2019 17:43
PS
the last thing that PQE needs is a leak. They will be checking all moving parts for signs of a possible leak, for signs of abrasion, testing for excessive vibration, signs of clogging etc. This, in effect, is a new plant: they have to check and double-check that everything is operating within acceptable parameters.
To check parts of the plant, they will have clean it, disassemble it and reassemble it.
DYOR