Maybe? Latest sector is food, nothing like the 'how long? We have a lorry waiting' or 'hurry up or we will have to bin the whole run'. Ah the joys of FMCG. Aka fast moving convenience goods.
Agree Push2, much better to give a pessimistic timeline, or at least involve some leeway. I have been caught out too may times saying I will have the production line running in 15 minutes (trying to be the hero) only for the repair to go pear-shaped and have the manager on my back. I know say an hour, then go into the canteen spoiling their extra tea break after 15 minutes so I can get one. :-)
System Entry Calorific Value, 41.1200 System Entry Energy, 1585556.0000 System Entry Volume, 0.1386 Dec averages upto & including 16th 41.20 / 1781458 / 0.1556 / 59758 therms so still above the hedge requirements I believe. No panic anyway as we still have 15 days production to come.
Another piece of the jigsaw about to be in position, lovely. The second compressor will be of use either way, sidetrack or no sidetrack. It will be a back up if nothing else, or reduce the loading on the other compressor.
I think this is a very good sign. They could not confirm the appointment after doing the checks originally as we went into admin. Admin has gone, the appointment is confirmed, and crucially, Marija is still coming on board after 18 months delay.
Fair enough, but it just comes across as a bit odd with the timing when we are almost on, if not already on the home straight to what will be a pivotal moment for the company. Assuming that most, if not all PIs are waiting (holding) for final news on the sidetrack and compressor?
Push2@13:55....you need therapy mate! I still recall the post several weeks back about knowing all is good if there is a tweet of GL absolutely lathered outside the office.
RE: Press Conference over renewables is astonishing....from USA14 Dec 2022 07:42
Indeed! I have had the 'pleasure' of several endoscopy sessions, which by comparison sounds like a cakewalk to what you had., though the pre check meds are not so good!!