RE: Cloughton - Potential29 Sep 2023 12:20
Hi Tovoc. For what it's worth, here's something I posted in mid September:
"Before any of us is carried away by Cloughton's 184 Bcf of GIP (P50 Case) and the possibility of our drilling an appraisal well soon, I reckon about £2.5 to £3.0 million gross would be needed for a well, of which our 40% share would be £1.0 to £1.2 million. Unfortunately the Carboniferous sandstone reservoir here is, quite frankly, pretty horrendous as it flowed at only 40,000 cu. ft per day from an overall section more than 4,000 feet thick. So IMO it would need to be fracked to get a commercial flow rate, which is no longer on the cards. Perhaps it needs a whole series of proppant squeezes!"
On reflection, more up to date completion methods ought to help with the potential flow rate as it's been many years since Cloughton was drilled by Bow Valley.