Ann: Castillo selects Depco Drilling as lead contractor31 Aug 2020 01:08
As previously announced, the RC drilling campaign for the Arya Prospect comprises circa 3,432m over 14 drill-holes, within an area ~1,500m by ~1,000m, with targets near surface and deeper geophysical anomalies2
o For the Big One Deposit, there are two parts to the upcoming drilling program:
? A 4,385m RC drilling campaign, over 35 drill-holes, which will focus on a strike zone (~580m by ~120m) to test for mineralisation from ~26m up to ~190m below surface; and
? An incremental 160m diamond drilling campaign, targeting two drill-holes that are testing primarily for shallow mineralisation from ~26m up to ~52m below surface3 o In lead up to the commencement of the drilling campaign, the geology team – which have been on site for several weeks now – are due to re-visit the Arya Prospect for a closer review and peg drill sites