RE: Big deal4 Dec 2018 14:06
Can't remember who it was but someone here estimated /calculated that our drills to date,indicate 50m oz Cu equiv.Even if it were lower than that and we have only drilled less than 10% of the prospect area. then the value attributed to QB2 makes us seem a very valuable prospect
"The QB2 project has a 28-year mine life and includes 199-million tonnes of inferred resources within the life-of-mine (LoM) plan.QB2 will produce 316 400 t/y of copper equivalent in the first five years of its 28-year mine life at an all-in sustaining cost of $1.38/lb and a C1 cash cost of $1.28/lb payable copper.The average LoM production is estimated to be 278 500 t/y of copper equivalent.The project, on a 100% basis, has a net present value of $2.43-billion and an internal rate of return of 14.1%, using a $3/lb copper price." GLA