According to SP Angel, all the items you listed below have a NPV of c. US$ 200 mm (see page 2 of last report). Divided by, say, 2.5 b shares (yes, SOU will keep issuing shares), the target price for all this stuff is US$ 0.08/sh, or 6.4 p/sh.
And this target price assumes no significant dilution in SOU´s equity interest in the Tendrara production concession (a big if).
Keep dreaming.
Regards
___________________________
Phase 1 Micro LNG Development - Sound fully funded for share of development costs
Deployment of field gas treatment, processing, liquefaction and storage facilities to deliver mobile LNG to buyer at site. The LNG buyer will distribute and sell on to its growing Moroccan industrial consumers within the domestic gas market.
Supplies of LNG are to be an annual contractual quantity of 100 million standard cubic metres of gas (approximately 4 billion standard cubic feet of gas per year) over a ten-year period in a liquid form.
Binding gas sales agreement and associated funding in place with Afriquia Gaz*. A ten-year commitment from first gas to sell annual contractual quantity of 100 million standard cubic metres per annum with take or pay agreement priced at $6–$8.346 per mmBTU ex plant.
Development utilises the existing well stock of TE-6 and TE-7, with additionally the drilling of one new well as required to maintain the ten-year period of production plateau.
Gas as a transition fuel flowing to the GME pipeline
Phase 2 Tendrara TE-5 Development
20’’ inch, 120km Tendrara Gas Export Pipeline ("TGEP"):
Tie-in to existing GME pipeline (Station M04): FEED completed by Metragaz (EMPL operator)
Pipeline EIA permit approved
70 mmscf/d raw gas CPF processing capacity: FEED completed by Enagás Consortium
CPF EIA permit approved
Gas Sales Agreement ("GSA") with ONEE (Office National de l'Electricite et de l'Eau potable) signed November 2021 for domestic power plants for gas-to-power generation (transit via GME line), minimum volume of 0.3 bcm/year
Six horizontal wells planned for First Gas (Phase 2)
With the oil and gas Majors now Cash rich, anyone for 25% of a future development supplying Morocco and potential Europe. Dreams............