RE: Lots to look fwd to31 Oct 2025 13:41
@Casper. Hole 3 is RC drilling and therefore no cores. It will have sample bags with drill cuttings. Hole 3 should now be complete, 500m RC is basically about a week's worth (or even less) of work, so if they started on say Monday 20th After the rig arrival that weekend then it should literally be done and dusted. If they have a plan for the position and direction of H4, tbh that one could be well under way and also not far off reaching its target- maybe by Monday if it is also going to 500m.
Rock chip samples can be tested much quicker and if they are able to be selective, they could just select the cuttings from say 265 to 280 metres similar to WRSDDH0008 and get those results back around the same time as the H1 cores. Next week might therefore be the big reveal unless they sneak it in today at 4.30pm.