RE: Don't sell short23 Jun 2020 12:36
It’s 25% of this :
News in 2 weeks by the looks.
Key Points for the combined Chuditch, Chuditch North and Chuditch South closures ("Greater Chuditch") within the Chuditch PSC:
· Total gross estimate of Mean gas in place (GIIP) of 2,320 BCF
· Gas recovery expected by Shell to be in the range of 55% to 75%, leading to gross estimates of Mean recoverable gas of 1,276 to 1,740 BCF, considered by Baron to be Prospective Resources
· Risks associated with trap, reservoir and charge for the Greater Chuditch closure were considered by Shell to be zero (that is, the Geological Chance of Success is assumed to be 100%), remaining uncertainty being on the volumes in place