UD 2 Key Element20 Nov 2023 14:21
The final technical design of the 18km gas pipeline connecting the Ud-2 well with Mtsare Khevi gas processing facility (which is connected to Georgia's natural gas distribution grid) is being completed and the pipeline right of way is being secured.
The powers that be might have thought.......Take the land back and tax accordingly?