RE: Deal and charts (for Bluebelly)25 Jun 2024 09:38
Mornin all
I think there are a few points to discuss with Leon and Neal, and I think I may have an explanation regarding the electrical circuits that are always late.
Firstly, As I have said a few times, Leon is always talking about Copper which to me seems to be Sulphide as he goes on about purification,(maybe not that word. We need to find out is we are talking Sulphide or Oxide which makes a huge difference in profits and cash flow.
The second area to look at and ask is do they design each electrical component that takes 12 months to get here after they have done the research into what the testing discovers, that would mean they can build the heavy stuff quickly but can't build the electrical components until they have satisfied themselves that the design of the circuits will do the right job. So they can't forward order the electrical components as they are not the same every time. This may be the case but I need a specialist or someone who knows much more than I do to answer, can you tweak an electrical component on site to change the mixture etc etc.
The third thing is that Leon will just not admit anything that makes him look wrong, ie: the unit has been done in time etc etc. We all know it hasn't but he won't admit it, THE ACHILLES HEEL