RE: Multilateral Well?10 Feb 2023 10:37
Kheldar, personally I don't think there is any problem with the original hole, the side track is to exploit the 3900m oil, the original hole is targeting totally different levels, multilateral drill all day long, after some Goggling, (I am no expert at all) the side track is commenced in a cased and cemented section of the main bore and at a depth where the pressure is controllable, we have no idea of the Geology outside the bore, if we start punching holes in the casing where porous rocks are present, what problems will that cause?