RE: Angus X update10 Feb 2025 13:28
On 14 February 2023, our appeal against the decision by West Sussex County Council to refuse permission for an extended well test at the Balcombe oil site was upheld. The Planning Inspectorates decision was subsequently challenged in the High Court by a local residence group. In October 2023 the High Court upheld the Planning Inspectorates decision to grant the Company the right to test the existing well, which has now also been successfully appealed. The Company now waits to hear whether their appeal will be successful and should know by January 2025.
Potential Future Drilling and Gas Storage
A planning application was submitted post-period end to the local planning officer. The planning application will allow for drilling, completion and testing of four new wells to be drilled from either the A or B site giving us flexibility in future development.
Upon completion of the seismic remapping exercise described above, Angus will progress with the development of a reservoir model (static and dynamic) which is anticipated to be completed Q3 2024 and will be utilised to fine tune the detailed design and anticipated results of future drilling targets and gas storage potential.
The new CPR has taken account of production performance from three wells currently on production and the addition of two further development wells in the Main Westphalian reservoir, SF9 and SF10, which are scheduled to enter production in January 2025 and January 2026 respectively.
Any update on these please? Getting a little fomo 😂