Some general info scraped from a chat with AI7 May 2026 08:19
The Technical Sequence at Sagebrush-1The testing hasn't been one continuous flow from day one; rather, it’s a staged process to ensure the well is clear of old fluids:Phase 1: Well Preparation (April 2026): Before they could test the helium zones, they had to cement off the existing Ismay oil zone, pressure test the casing for integrity, and drill out old bridge plugs.Phase 2: Perforation (Late April/Early May 2026): Perforating the Lower Leadville—the primary helium reservoir—was scheduled to begin around the last week of April.Phase 3: Stimulation & Flow: Acid stimulation is the next step to "open up" the formation and clear historical mud damage from the 1990s.