RRE 2020 news flow4 Jun 2020 13:40
So just going through the RNSs and presentations to find out what is still happening in 2020 after the CAPEX cuts (£200 mil was planned now cut down "at least" 40%), which means only 3 wells instead of 7 - from which one will be in the ARRAN field and the other two were the Brae wells already drilled. We might also potentially get news from TAIN, which is in the Define phase of developement. So that should be all on the operational level news flow + we all hope for some cheeky acquisition (even smaller one would do), it would also make sense since we are saving a lot of money on those 4 cancelled drills