"At the Brockham Oil Field, site work has commenced in preparation for rig arrival early in Q2 to reinstate production from the Brockham 2Y well. "
If "early in Q2" translates to April then only 7 days until some news.
How much revenue does this translate into?
The chart I've found seems to suggest gas prices have bounced over the last week - up 10% according to https://tradingeconomics.com/commodities
6 November 2023
Angus Energy Plc
("Angus Energy", the "Company" or together with its subsidiaries, the "Group")
(AIM:ANGS)
Commissioning of Saltfleetby BO7T Well Permanent Flowline
Angus Energy (AIM: ANGS) is pleased to announce that the permanent flowline from the BO7T well at the Saltfleetby gas field in Lincolnshire was successfully commissioned on Friday 3rd November at 16.30 with minimum production loss. This has been a challenging project not least because of the weather conditions during construction but also because of the technical challenges in finalising the flowline design.
Operations Director Tim Kaye commented "This is another key Company milestone delivered safely and with no harm to the environment and we can all take pride in another site goal achieved with the material benefit of reducing costs at site and further improving the long-term sustainability of the Saltfleetby Field".
CEO Richard Herbert added "Since the BO7T well came on stream in May, it has been operating in a temporary separator and flowline configuration, which has added complexity and costs to the operations at the field. The period of well clean up was much longer than we had expected, due to incomplete acidization of the mud additives used to control the wellbore during the drilling of the reservoir section. Now that fines production has reduced and with the completion of the engineering works to install the permanent flowline, we are seeing stable well performance and will have a significant reduction in operating costs with the removal of expensive rented equipment and personnel required for the temporary flowline. I am very grateful to the operations team at Saltfleetby for their excellent work to complete this significant project for the Company".
6 November 2023
Looks to me like there are figures for the 10th.
Applicable At Applicable For Data Item Value Generated Time Quality Indicator
11/05/2023 01:00:00 11/05/2023 System Entry Calorific Value, Saltfleetby, D+1 41.2200 12/05/2023 12:01:01 L
11/05/2023 01:00:00 11/05/2023 System Entry Energy, Saltfleetby, D+1 3073333.0000 12/05/2023 12:01:01 L
11/05/2023 01:00:00 11/05/2023 System Entry Volume, Saltfleetby, D+1 0.2683 12/05/2023 12:01:01 L
12/05/2023 09:45:00 10/05/2023 System Entry Calorific Value, Saltfleetby , D+2 41.3200 12/05/2023 10:00:00
12/05/2023 09:45:00 10/05/2023 System Entry Energy, Saltfleetby , D+2 2334444.0000 12/05/2023 10:00:00
12/05/2023 09:45:00 10/05/2023 System Entry Volume, Saltfleetby , D+2 0.2041 12/05/2023 10:00:00